Cars · LTA’s COE results
COE results: the latest bidding round, every category
The COE premium for every category in the latest bidding round, from LTA: the change, bids against quota, next month’s PQP and every round since 2010.
Cat A Cars up to 1,600cc and 97kW (130bhp); electric cars up to 110kW (147bhp)
$130,100
down $8,901 from $139,001. 1,464 bids for 1,193 COEs (1.23 a COE).
Cat B Cars above 1,600cc or 97kW (130bhp); electric cars above 110kW (147bhp)
$125,600
down $6,734 from $132,334. 1,066 bids for 951 COEs (1.12 a COE).
| Category | Premium | Change | Bids for quota |
|---|---|---|---|
| Cat C Goods vehicles and buses | $91,790 | down $210 | 504 for 314 |
| Cat D Motorcycles | $10,489 | down $200 | 635 for 506 |
| Cat E Open: any vehicle except motorcycles | $136,000 | up $2 | 466 for 266 |
Next round: opens 12 noon Mon 7 Dec, closes 4 pm Wed 9 Dec. COE bidding dates for every round Renewing in December? The PQP is $132,668 for Cat A and $131,323 for Cat B. Every category Renew now or wait?
The next bidding round
- Mon 7 Dec 2026, 12 noon Bidding opens for the first round of December 2026.
- Wed 9 Dec 2026, 4 pm Bidding closes. Three weeks after the round before, not two.
- Shortly after LTA publishes the results; this page updates within 10 minutes of them reaching data.gov.sg. Add the closing time to my calendar
The rounds after it:
- Second round of December 2026: Mon 21 Dec to Wed 23 Dec
From LTA’s schedule of COE open bidding exercises for 2026 (checked 30 Oct 2026). Rounds usually open on the first and third Monday of the month and close on the Wednesday; public holidays move them, as the notes say.
How a COE works, from bid to renewal
Bid in an open round Next
Rounds usually open at 12 noon on the first and third Monday of the month and run 3 working days, closing at 4 pm. Each bidder sets a reserve price: the most they will pay.
Next: Mon 7 Dec to Wed 9 Dec. Every round this year
The premium is set at the close
While a round is open, LTA shows the Current COE Price: the highest unsuccessful bid plus $1. The price at the close is the round’s Quota Premium, and every successful bidder in a category pays that same premium (LTA).
Latest, Nov 2026 (2): Cat A $130,100, Cat B $125,600.
Register the vehicle
A successful bid gives a temporary COE, valid 6 months for Cat A, B and D and 3 months for Cat C and E, to register the vehicle.
10 years on the road
The COE lets the vehicle be used on the road for 10 years. Deregister a car before then and part of what was paid comes back: our PARF rebate calculator works out the PARF and COE rebates.
At 10 years: renew or deregister
Either Renew, without bidding
Pay the Prevailing Quota Premium (PQP) for the category, the average of the last three months’ premiums. The full PQP renews for 10 years; 50% of it renews for 5 years, which Cat A, B and D vehicles can do only once (LTA). A car whose COE is renewed can no longer get a PARF rebate.
Renewing in December: Cat A $132,668, Cat B $131,323. Every category
Or Deregister
Scrap or export the car. One deregistered at 10 years old or less gets a PARF rebate.
Rules from LTA’s pages on the COE and bidding and COE renewal, checked 12 Nov 2026. Premiums from LTA’s results on data.gov.sg, read 8:50 am, 19 Nov SGT; the PQP worked out as LTA does.
PQP: what renewing a COE costs
The Prevailing Quota Premium (PQP) is what you pay to renew a COE instead of bidding. For renewals in December 2026:
| Category | PQP, December 2026 | Change |
|---|---|---|
| Cat A Cars up to 1,600cc and 97kW (130bhp); electric cars up to 110kW (147bhp) | $132,668 | up $2,785 |
| Cat B Cars above 1,600cc or 97kW (130bhp); electric cars above 110kW (147bhp) | $131,323 | down $496 |
| Cat C Goods vehicles and buses | $92,188 | up $374 |
| Cat D Motorcycles | $11,288 | down $104 |
How December 2026’s PQP is worked out
LTA takes the premiums of the last six rounds (three months) and averages them. Cat A: (133,009 + 131,890 + 130,001 + 132,004 + 139,001 + 130,100) ÷ 6 = 132,667.50, rounded up to the dollar: $132,668.
| Round | Cat A | Cat B |
|---|---|---|
| Sep 2026 (1) | $133,009 | $135,001 |
| Sep 2026 (2) | $131,890 | $133,000 |
| Oct 2026 (1) | $130,001 | $130,100 |
| Oct 2026 (2) | $132,004 | $131,901 |
| Nov 2026 (1) | $139,001 | $132,334 |
| Nov 2026 (2) | $130,100 | $125,600 |
PQP worked out by us from LTA’s results, the way LTA does it: the mean of the last six rounds, rounded up. It matches the Cat A PQP LTA reports through SingStat (table M651121) in 197 of 197 months since 2010. LTA publishes each month’s PQP after the month’s second round; it applies to renewals the month after.
Which COE category is my vehicle?
Pick an example or put in your vehicle. You get its category under LTA’s rules today, why, and what that category’s COE closed at.
LTA’s proposal: one category for cars
Proposed, not decided. On 8 October 2026 LTA asked the public whether to merge Cat A and Cat B into one category for cars, with a fee or rebate on top set by the car’s value (the median Open Market Value of its model): lower-value cars would get a rebate, mid-range cars nothing, higher-value cars a fee. It is asking whether to use three or five bands, how large each should be, whether renewals would be included, and whether Cat E should be removed or kept for cars only.
The consultation closed on 2 November 2026. LTA says its review should finish by the end of 2026, with its findings and recommendations by the first half of 2027. No start date has been given, so today’s categories, quotas and the checker above still apply.
Why now: LTA says engine size and power no longer separate mass-market cars from higher-value ones, especially with electric cars built to fit Cat A’s limits, and that Cat A’s premium was above Cat B’s on three occasions between February and June 2026. In LTA’s results, Cat A has closed above Cat B in 6 rounds of 2026 so far, and in 24 rounds since 2010 (listed below).
From LTA’s news release of 8 October 2026 and the consultation on REACH. We’ll update this box and send a COE alert when LTA announces a decision.
Bids against quota
| Category | Quota | Bids received | Bids a COE | Successful | Unsuccessful |
|---|---|---|---|---|---|
| Cat A | 1,193 | 1,464 | 1.23 | 1,130 | 334 |
| Cat B | 951 | 1,066 | 1.12 | 951 | 115 |
| Cat C | 314 | 504 | 1.61 | 314 | 190 |
| Cat D | 506 | 635 | 1.25 | 499 | 136 |
| Cat E | 266 | 466 | 1.75 | 225 | 241 |
More bids for each COE means more buyers chasing the same supply. Successful bids can come in slightly under the quota, as the table shows.
Cat A Cat B
Tap or hover on the chart to read a value.
How many COEs there are
LTA sets the number of COEs once a quarter, for six rounds. Nov 2026 to Jan 2027: 19,298 COEs, 1.1% more than Aug 2026 to Oct 2026.
| Category | Nov 2026 to Jan 2027 | About a round | Aug 2026 to Oct 2026 | Change |
|---|---|---|---|---|
| Cat A | 7,134 | 1,189 | 7,134 | 0.0% |
| Cat B | 5,707 | 951 | 5,527 | +3.3% |
| Cat C | 1,873 | 312 | 1,836 | +2.0% |
| Cat D | 3,004 | 501 | 3,065 | −2.0% |
| Cat E | 1,580 | 263 | 1,523 | +3.7% |
Every quarter in LTA’s current file
| Quarter | Cat A | Cat B | Cat C | Cat D | Cat E | Total |
|---|---|---|---|---|---|---|
| Nov 2026 to Jan 2027 | 7,134 | 5,707 | 1,873 | 3,004 | 1,580 | 19,298 |
| Aug 2026 to Oct 2026 | 7,134 | 5,527 | 1,836 | 3,065 | 1,523 | 19,085 |
| May 2026 to Jul 2026 | 7,434 | 5,205 | 1,742 | 3,145 | 1,526 | 19,052 |
| Feb 2026 to Apr 2026 | 7,585 | 4,864 | 1,742 | 3,198 | 1,435 | 18,824 |
| Nov 2025 to Jan 2026 | 7,662 | 4,783 | 1,692 | 3,198 | 1,649 | 18,984 |
Where the number comes from: the cars and motorcycles taken off the road. Since February 2023 each quarter’s quota is the rolling average of deregistrations over the previous four quarters (LTA counts a quarter of the year’s total), less deregistrations LTA has already earmarked to redistribute, plus small adjustments (taxis, expired temporary COEs, the Early Turnover Scheme); Cat E gets 10% of what comes from Cat A, B and C. LTA has set growth in the number of cars and motorcycles at 0% a year until 31 January 2028 (0.25% a year for goods vehicles and buses).
From LTA’s quota tables (Annex A, PDF) and its news release of 26 October 2026. “About a round” is the quarter’s quota divided by six; LTA’s actual quota each round varies a little, as the results show.
Wait a round? How far premiums move
Thinking of waiting a round for a lower premium? History can’t say which way the next round goes, but it shows how much is usually at stake. Over the last 48 rounds, Cat A moved by more than $5,000 in 14 and by more than $10,000 in 2; it went up in 28 and down or stayed in 20.
| Category | Went up, last 48 | Over $5,000, last 48 | Over $10,000, last 48 | Over $5,000, since 2010 | Typical move, since 2010 |
|---|---|---|---|---|---|
| Cat A | 58% | 29% | 4% | 17% | $2,001 |
| Cat B | 58% | 33% | 8% | 24% | $2,500 |
| Cat C | 56% | 0% | 0% | 7% | $1,501 |
| Cat D | 56% | 0% | 0% | 1% | $189 |
| Cat E | 65% | 10% | 6% | 16% | $2,001 |
Changes between one round and the next, from LTA’s results on data.gov.sg. “Last 48” is the last 48 changes, about two years; “typical move” is the median change, up or down. This is a record of the past, not a forecast, and we don’t give one: the next premium depends on bids no one can see.
COE prices since 2010
Cat A Cat B
Tap or hover on the chart to read a value.
The highest Cat A premium since 2010 was $139,001, in the first round of November 2026; Cat B’s was $150,001, in the second round of October 2023.
How many COEs were on offer
The premium comes from how many COEs there are against how many people bid, so it helps to see the supply under the price. In whole years since 2010, Cat A and Cat B together offered the fewest COEs in 2013: 16,764, in a year when Cat A averaged $74,690. They offered the most in 2016: 80,095, when Cat A averaged $49,587. Demand moves too, so supply doesn’t explain every round.
Cat A Cat B
Tap or hover on the chart to read a value.
Each year, as paid and in today’s dollars
Prices rise, so a premium from 2013 cost more in today’s money than it looks. Averaged over each year’s rounds and put in September 2026 dollars, Cat A was highest in 2026 (its 22 rounds so far), at $123,086.
| Year | Cat A | Cat A, today’s $ | Cat B | Cat B, today’s $ |
|---|---|---|---|---|
| 202622 rounds | $122,169 | $123,086 | $124,730 | $125,688 |
| 2025 | $102,912 | $105,581 | $120,748 | $123,903 |
| 2024 | $90,495 | $93,677 | $103,730 | $107,399 |
| 2023 | $94,538 | $100,209 | $121,801 | $129,051 |
| 2022 | $75,809 | $84,085 | $100,946 | $112,046 |
| 2021 | $47,425 | $55,895 | $61,223 | $72,084 |
| 202018 rounds | $35,404 | $42,657 | $38,155 | $45,971 |
| 2019 | $29,907 | $36,029 | $38,815 | $46,764 |
| 2018 | $33,038 | $40,043 | $35,345 | $42,837 |
| 2017 | $45,991 | $55,973 | $51,800 | $63,041 |
| 2016 | $49,587 | $60,695 | $52,122 | $63,799 |
| 2015 | $60,601 | $73,779 | $66,851 | $81,381 |
| 2014 | $67,675 | $81,968 | $73,282 | $88,759 |
| 2013 | $74,690 | $91,369 | $78,712 | $96,283 |
| 2012 | $63,898 | $79,941 | $84,431 | $105,706 |
| 2011 | $48,206 | $63,083 | $64,938 | $84,990 |
| 2010 | $30,405 | $41,828 | $39,834 | $54,769 |
The mean of each year’s rounds (24 in a full year). Today’s dollars: each round’s premium × SingStat’s CPI (all items) for September 2026 ÷ the CPI for the round’s month, then averaged.
Round by round
| Round | Cat A | Cat B | Cat C | Cat D | Cat E |
|---|---|---|---|---|---|
| Nov 2026 (2)18 Nov | $130,100 | $125,600 | $91,790 | $10,489 | $136,000 |
| Nov 2026 (1)4 Nov | $139,001 | $132,334 | $92,000 | $10,689 | $135,998 |
| Oct 2026 (2)21 Oct | $132,004 | $131,901 | $92,200 | $10,778 | $135,790 |
| Oct 2026 (1)7 Oct | $130,001 | $130,100 | $91,889 | $11,012 | $137,000 |
| Sep 2026 (2)23 Sep | $131,890 | $133,000 | $92,144 | $12,201 | $137,000 |
| Sep 2026 (1)9 Sep | $133,009 | $135,001 | $93,101 | $12,556 | $137,890 |
| Aug 2026 (2)19 Aug | $128,501 | $131,001 | $90,002 | $11,301 | $135,000 |
| Aug 2026 (1)5 Aug | $123,890 | $129,910 | $91,545 | $10,503 | $131,000 |
| Jul 2026 (2)22 Jul | $126,000 | $129,890 | $93,889 | $10,202 | $129,971 |
| Jul 2026 (1)8 Jul | $129,000 | $130,889 | $95,000 | $10,201 | $129,801 |
| Jun 2026 (2)17 Jun | $123,847 | $123,502 | $93,001 | $9,989 | $129,002 |
| Jun 2026 (1)4 Jun | $126,009 | $126,989 | $94,000 | $10,000 | $129,000 |
The 60 rounds before, back to Dec 2023 (1)
| Round | Cat A | Cat B | Cat C | Cat D | Cat E |
|---|---|---|---|---|---|
| May 2026 (2)20 May | $124,229 | $129,501 | $92,223 | $9,689 | $130,000 |
| May 2026 (1)6 May | $124,790 | $126,236 | $87,479 | $9,452 | $127,700 |
| Apr 2026 (2)22 Apr | $123,010 | $121,001 | $83,501 | $9,290 | $125,002 |
| Apr 2026 (1)8 Apr | $118,000 | $121,000 | $80,001 | $10,000 | $121,001 |
| Mar 2026 (2)18 Mar | $111,890 | $115,568 | $78,000 | $9,589 | $118,119 |
| Mar 2026 (1)4 Mar | $108,220 | $114,002 | $76,000 | $8,602 | $114,890 |
| Feb 2026 (2)20 Feb | $106,501 | $105,001 | $74,999 | $7,989 | $112,890 |
| Feb 2026 (1)4 Feb | $106,320 | $110,890 | $74,801 | $8,289 | $116,000 |
| Jan 2026 (2)21 Jan | $109,501 | $121,634 | $75,202 | $8,860 | $120,891 |
| Jan 2026 (1)7 Jan | $102,009 | $119,100 | $75,503 | $8,689 | $122,000 |
| Dec 2025 (2)17 Dec | $109,501 | $115,102 | $77,003 | $8,081 | $119,000 |
| Dec 2025 (1)3 Dec | $105,413 | $123,900 | $76,501 | $8,289 | $123,000 |
| Nov 2025 (2)19 Nov | $109,000 | $129,890 | $76,389 | $8,729 | $125,001 |
| Nov 2025 (1)5 Nov | $110,002 | $115,001 | $76,000 | $8,600 | $121,010 |
| Oct 2025 (2)23 Oct | $122,000 | $131,889 | $76,801 | $9,389 | $136,000 |
| Oct 2025 (1)8 Oct | $128,105 | $141,000 | $74,301 | $9,810 | $140,009 |
| Sep 2025 (2)17 Sep | $119,003 | $136,890 | $72,501 | $9,209 | $140,502 |
| Sep 2025 (1)3 Sep | $107,889 | $127,501 | $71,556 | $9,101 | $127,901 |
| Aug 2025 (2)20 Aug | $104,524 | $124,400 | $72,190 | $8,809 | $125,001 |
| Aug 2025 (1)6 Aug | $102,009 | $123,498 | $70,001 | $9,189 | $122,334 |
| Jul 2025 (2)23 Jul | $101,102 | $119,101 | $68,600 | $9,511 | $120,000 |
| Jul 2025 (1)9 Jul | $101,102 | $119,600 | $66,689 | $9,389 | $118,500 |
| Jun 2025 (2)18 Jun | $98,124 | $116,670 | $65,000 | $8,600 | $116,889 |
| Jun 2025 (1)4 Jun | $96,999 | $113,000 | $62,000 | $9,000 | $113,900 |
| May 2025 (2)21 May | $102,501 | $116,988 | $63,189 | $8,707 | $118,010 |
| May 2025 (1)7 May | $103,009 | $119,890 | $62,590 | $8,709 | $118,889 |
| Apr 2025 (2)23 Apr | $99,500 | $117,003 | $65,001 | $9,309 | $118,001 |
| Apr 2025 (1)9 Apr | $97,724 | $117,899 | $68,782 | $9,889 | $117,002 |
| Mar 2025 (2)19 Mar | $94,502 | $116,890 | $70,089 | $9,511 | $116,991 |
| Mar 2025 (1)5 Mar | $92,730 | $113,000 | $67,001 | $9,201 | $112,901 |
| Feb 2025 (2)19 Feb | $92,850 | $109,598 | $65,189 | $8,791 | $110,002 |
| Feb 2025 (1)5 Feb | $85,000 | $111,104 | $62,506 | $8,289 | $110,000 |
| Jan 2025 (2)22 Jan | $93,601 | $116,625 | $65,476 | $7,721 | $115,112 |
| Jan 2025 (1)8 Jan | $93,699 | $121,501 | $67,891 | $9,001 | $123,000 |
| Dec 2024 (2)18 Dec | $96,000 | $109,000 | $69,890 | $8,381 | $108,992 |
| Dec 2024 (1)4 Dec | $94,000 | $103,010 | $70,289 | $7,878 | $104,001 |
| Nov 2024 (2)20 Nov | $89,889 | $105,081 | $69,000 | $8,669 | $107,501 |
| Nov 2024 (1)6 Nov | $99,889 | $108,001 | $68,340 | $9,089 | $109,000 |
| Oct 2024 (2)23 Oct | $102,900 | $113,890 | $72,939 | $9,589 | $114,700 |
| Oct 2024 (1)9 Oct | $103,799 | $116,002 | $75,009 | $10,001 | $116,000 |
| Sep 2024 (2)18 Sep | $98,524 | $110,001 | $74,000 | $9,900 | $113,104 |
| Sep 2024 (1)4 Sep | $96,490 | $106,300 | $74,001 | $9,801 | $106,901 |
| Aug 2024 (2)21 Aug | $93,900 | $105,889 | $72,400 | $9,310 | $106,001 |
| Aug 2024 (1)7 Aug | $94,289 | $106,101 | $71,100 | $9,601 | $105,239 |
| Jul 2024 (2)17 Jul | $91,899 | $100,000 | $70,601 | $9,089 | $100,341 |
| Jul 2024 (1)3 Jul | $91,001 | $100,901 | $70,001 | $8,900 | $100,889 |
| Jun 2024 (2)20 Jun | $90,889 | $102,334 | $69,900 | $9,002 | $100,000 |
| Jun 2024 (1)5 Jun | $88,200 | $100,607 | $70,589 | $8,989 | $101,600 |
| May 2024 (2)23 May | $92,700 | $105,689 | $72,001 | $9,311 | $105,002 |
| May 2024 (1)8 May | $93,604 | $105,002 | $70,001 | $9,503 | $104,689 |
| Apr 2024 (2)17 Apr | $94,010 | $102,001 | $68,502 | $9,990 | $103,249 |
| Apr 2024 (1)3 Apr | $89,000 | $101,334 | $67,501 | $10,000 | $101,002 |
| Mar 2024 (2)20 Mar | $85,489 | $96,011 | $70,112 | $9,689 | $95,856 |
| Mar 2024 (1)6 Mar | $83,000 | $96,010 | $75,599 | $9,400 | $95,010 |
| Feb 2024 (2)21 Feb | $76,801 | $97,000 | $73,001 | $8,911 | $94,006 |
| Feb 2024 (1)7 Feb | $79,000 | $102,338 | $72,001 | $9,290 | $100,101 |
| Jan 2024 (2)17 Jan | $81,589 | $112,000 | $68,001 | $9,309 | $109,004 |
| Jan 2024 (1)4 Jan | $65,010 | $85,010 | $67,599 | $9,114 | $106,388 |
| Dec 2023 (2) | $85,000 | $110,001 | $69,423 | $9,002 | $118,388 |
| Dec 2023 (1) | $88,020 | $130,100 | $71,001 | $9,858 | $133,388 |
All 400 rounds since January 2010, with quota, bids, the PQP and today’s dollars: download the CSV.
The gap between Cat A and Cat B
Cat A is meant for smaller, cheaper cars, yet its premium closed above Cat B’s in 24 of 400 rounds since 2010. Of the full years, the gap was widest in 2023, when Cat B averaged $27,263 more than Cat A. So far in 2026, Cat B has averaged $2,560 more than Cat A. LTA points to the rounds when Cat A closed above Cat B in its proposal to merge the two.
Cat B premium less Cat A premium
Tap or hover on the chart to read a value.
The 24 rounds when Cat A closed above Cat B: Nov 2026 (2), Nov 2026 (1), Oct 2026 (2), Jun 2026 (2), Apr 2026 (2), Feb 2026 (2), Mar 2020 (2), Feb 2020 (2), Jul 2018 (2), Jun 2018 (2), Jun 2018 (1), May 2018 (2), May 2018 (1), Apr 2018 (2), Mar 2018 (2), Feb 2017 (1), Dec 2016 (1), Feb 2016 (1), Jan 2016 (2), Dec 2013 (1), Sep 2013 (1), May 2013 (1), Apr 2013 (2), Mar 2013 (1).
Every round since January 2010 from LTA’s results on data.gov.sg (LTA also publishes older results, back to 1990, in its statistics). Today’s dollars use SingStat’s CPI, all items.
Cars in Singapore 4 pages
Questions people ask
What are the latest COE prices?
In the second round of November 2026, which closed on 18 November 2026, the COE premium was $130,100 for Cat A (down $8,901) and $125,600 for Cat B (down $6,734). Cat C closed at $91,790, Cat D at $10,489 and Cat E at $136,000. The next round closes at 4 pm on Wednesday 9 December.
When is the next COE bidding?
Rounds open at 12 noon on Monday and close at 4 pm on Wednesday, twice a month, usually in the first and third weeks; public holidays move some of them. The dates of the next rounds are above, from LTA’s schedule, with a calendar file for the next one.
What is the PQP, and how is it worked out?
The Prevailing Quota Premium is what you pay to renew a COE instead of bidding for a new one. It is the average of the last six rounds’ premiums (three months), rounded up to the dollar, and changes every month. LTA publishes it after each month’s second round, and it applies to renewals the month after. This month’s PQP and the sum are above; whether to renew now or wait a month, and what renewing costs with a loan, are on COE renewal.
Is my car Cat A or Cat B?
A petrol, diesel or hybrid car is Cat A if its engine is up to 1,600 cc and its power up to 97 kW (130 bhp); above either limit, it is Cat B. A fully electric car is placed by power alone: Cat A up to 110 kW (147 bhp). The checker works it out for yours.
Why is Cat A sometimes higher than Cat B?
LTA says more buyers are now competing for Cat A COEs, partly because cars, especially electric ones, can be built to fit Cat A’s engine and power limits, which has narrowed the gap with Cat B. It is consulting on merging the two. Every round where Cat A closed above Cat B is listed above.
Can I use a Cat E COE for a car?
Yes. Cat E is open to every kind of vehicle except motorcycles, so a Cat E COE can be used for a car or a goods vehicle. It usually costs about as much as Cat B or more: from January 2010 to October 2026, Cat E closed within 5% of Cat B’s premium, or above it, in 396 of 398 rounds. This round’s is in the table at the top.
Why does the number of COEs change?
The quota follows the vehicles taken off the road: each quarter’s quota is based on deregistrations over the previous four quarters, with no growth allowed in the number of cars and motorcycles. What an owner gets back on deregistering is in our PARF rebate calculator. This quarter’s quota is above, from LTA’s own tables.
How we get these numbers
- A job reads LTA’s COE results on data.gov.sg every 10 minutes from 4 pm to 9 pm on the day each round closes and the day after, and once a day otherwise. A round is refused unless all five categories have it and every premium is in a sensible range; the page then keeps the last good read and says when it was.
- The PQP is worked out by us from the results, as LTA does it (the mean of the last six rounds, rounded up to the dollar), and checked against the Cat A PQP LTA reports through SingStat: 197 of 197 months match.
- The quota comes from LTA’s quota tables (a PDF we read each day); the bidding dates, the category rules and the consultation are typed in by us from LTA’s schedule and releases and checked on 30 Oct 2026. Today’s dollars use SingStat’s CPI.
- We first read this round’s results at 6:00 pm, 18 Nov 2026 SGT, 120 minutes after bidding closed.
- LTA’s results are under the Singapore Open Data Licence. Numbers.sg is not connected to LTA, any car dealer or any bank, no one pays us, and this page has no affiliate links. The category checker runs in your browser; nothing you type is sent anywhere. See our disclaimer, how we get our numbers and corrections.
Contains information from COE Bidding Results / Prices (Land Transport Authority) accessed on 19 Nov 2026 from the data.gov.sg website, which is made available under the terms of the Singapore Open Data Licence version 1.0. Numbers.sg is independent and is not endorsed by data.gov.sg.
Changes to this page
COE results and CPF retirement sums: each now has a step-by-step guide. How a COE works, from bid to renewal, marks where this round is and shows the latest premiums and this month’s PQP; what CPF does with your savings at 55 and after shows this year’s sums and CPF’s payout estimates. Each rule links to the LTA or CPF page it comes from. How a COE works
COE results: a chart of the gap between Cat A and Cat B since 2010, and a chart of the COEs on offer each round, set under the premiums. COE results
New: COE results. The latest bidding in every category, with the next round’s dates and a calendar reminder, the PQP for renewals (with the sum), a checker for which category your vehicle is in, LTA’s proposal to merge Cat A and Cat B, bids against quota, how far premiums move between rounds, and every round since 2010 as a chart and a CSV. Read from LTA’s data after each round closes. See COE results